Vijay Nagar to Kalupur Railway Station metro route
Red Line (Line 2, North-South Corridor), then Blue Line (Line 1, East-West Corridor): 5 stations, about 20 min.
First metro from Vijay Nagar about 06:32 · Last metro that makes every connection about 23:07
Vijay Nagar to Kalupur Railway Station route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Red Line (Line 2, North-South Corridor) towards APMCBoard at Vijay Nagar · trains from about 06:32 to 23:16
2 stops, about 5 min
Get off at Old High Court - Change line here, allow about 4 min.
-
Blue Line (Line 1, East-West Corridor) towards Vastral GamBoard at Old High Court · trains from about 06:36 to 23:16
3 stops, about 11 min
Get off at Kalupur Railway Station
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Vijay Nagar to Kalupur Railway Station metro fare
Ahmedabad Metro (Ahmedabad-Gandhinagar): about Rs 10 for about 7.2 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Vijay Nagar to Kalupur Railway Station metro
How long does the metro take from Vijay Nagar to Kalupur Railway Station?
About 20 minutes for 5 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Vijay Nagar and Kalupur Railway Station?
Yes, 1 change: at Old High Court take the Blue Line (Line 1, East-West Corridor) towards Vastral Gam.
What is the metro fare from Vijay Nagar to Kalupur Railway Station?
About Rs 10 on the Ahmedabad Metro (Ahmedabad-Gandhinagar), estimated from a distance of about 7.2 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Vijay Nagar to Kalupur Railway Station?
The first useful train leaves Vijay Nagar at about 06:32 and the last one that still makes every connection leaves at about 23:07. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.