DRM Office to MP Nagar metro route
Direct on the Orange Line: 2 stations, about 5 min.
First metro from DRM Office about 12:06 · Last metro that makes every connection about 19:36
DRM Office to MP Nagar route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Orange Line towards Subhash NagarBoard at DRM Office · trains from about 12:06 to 19:36
2 stops, about 5 min
Get off at MP Nagar
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about DRM Office to MP Nagar metro
How long does the metro take from DRM Office to MP Nagar?
About 5 minutes for 2 stations. Add your waiting time at the platform.
Is there a direct metro from DRM Office to MP Nagar?
Yes. Take the Orange Line towards Subhash Nagar; MP Nagar is the 2nd stop.
What are the first and last metro times from DRM Office to MP Nagar?
The first useful train leaves DRM Office at about 12:06 and the last one that still makes every connection leaves at about 19:36. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Madhya Pradesh Metro Rail Corporation Ltd (MPMRCL) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.