Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Subhash Nagar to DRM Office metro route

Direct on the Orange Line: 5 stations, about 13 min.

13 minjourney, about
5stations
Directno change
+ fareBhoj Metro (Bhopal Metro), separate

First metro from Subhash Nagar about 11:30 · Last metro that makes every connection about 19:00

Subhash Nagar to DRM Office route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Orange Line towards AIIMS
    Board at Subhash Nagar · trains from about 11:30 to 19:00
    5 stops, about 13 min
    1. Subhash Nagar
    2. Kendriya Vidyalaya
    3. Board Office Chauraha
    4. MP Nagar
    5. Rani Kamalapati Railway Station
    6. DRM Office
    Get off at DRM Office

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

DRM Office to Subhash Nagar

Questions about Subhash Nagar to DRM Office metro

How long does the metro take from Subhash Nagar to DRM Office?

About 13 minutes for 5 stations. Add your waiting time at the platform.

Is there a direct metro from Subhash Nagar to DRM Office?

Yes. Take the Orange Line towards AIIMS; DRM Office is the 5th stop.

What are the first and last metro times from Subhash Nagar to DRM Office?

The first useful train leaves Subhash Nagar at about 11:30 and the last one that still makes every connection leaves at about 19:00. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Madhya Pradesh Metro Rail Corporation Ltd (MPMRCL) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.