Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Petta to Kaloor metro route

Direct on the Blue Line: 9 stations, about 18 min.

18 minjourney, about
9stations
Directno change
+ fareKochi Metro, separate

First metro from Petta about 06:05 · Last metro that makes every connection about 23:05

Petta to Kaloor route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Blue Line towards Aluva
    Board at Petta · trains from about 06:05 to 23:05
    9 stops, about 18 min
    1. Petta
    2. Thykoodam
    3. Vyttila
    4. Elamkulam
    5. Kadavanthra
    6. Ernakulam South
    7. Maharaja's College
    8. M. G. Road
    9. Town Hall
    10. Kaloor
    Get off at Kaloor

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

Kaloor to Petta

Questions about Petta to Kaloor metro

How long does the metro take from Petta to Kaloor?

About 18 minutes for 9 stations. Add your waiting time at the platform.

Is there a direct metro from Petta to Kaloor?

Yes. Take the Blue Line towards Aluva; Kaloor is the 9th stop.

What are the first and last metro times from Petta to Kaloor?

The first useful train leaves Petta at about 06:05 and the last one that still makes every connection leaves at about 23:05. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Kochi Metro Rail Limited (KMRL) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.