Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Belgachia to Bengal Chemical metro route

Blue Line, then Green Line: 11 stations, about 30 min.

30 minjourney, about
11stations
1change
Rs 20fare, estimated

First metro from Belgachia about 06:15 · Last metro that makes every connection about 22:19

Belgachia to Bengal Chemical route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Blue Line towards Shahid Khudiram
    Board at Belgachia · trains from about 06:15 to 22:45
    7 stops, about 13 min
    1. Belgachia
    2. Shyambazar
    3. Shobhabazar Sutanuti
    4. Girish Park
    5. Mahatma Gandhi Road
    6. Central
    7. Chandni Chowk
    8. Esplanade
    Get off at Esplanade
  2. Change line here, allow about 4 min.
  3. Green Line towards Salt Lake Sector V
    Board at Esplanade · trains from about 06:07 to 22:37
    4 stops, about 12 min
    1. Esplanade
    2. Sealdah
    3. Phoolbagan
    4. Salt Lake Stadium
    5. Bengal Chemical
    Get off at Bengal Chemical

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Belgachia to Bengal Chemical metro fare

Kolkata Metro: about Rs 20 for about 14.2 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Bengal Chemical to Belgachia

Questions about Belgachia to Bengal Chemical metro

How long does the metro take from Belgachia to Bengal Chemical?

About 30 minutes for 11 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Belgachia and Bengal Chemical?

Yes, 1 change: at Esplanade take the Green Line towards Salt Lake Sector V.

What is the metro fare from Belgachia to Bengal Chemical?

About Rs 20 on the Kolkata Metro, estimated from a distance of about 14.2 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Belgachia to Bengal Chemical?

The first useful train leaves Belgachia at about 06:15 and the last one that still makes every connection leaves at about 22:19. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.