Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Kalighat to Dakshineshwar metro route

Direct on the Blue Line: 17 stations, about 39 min.

39 minjourney, about
17stations
Directno change
Rs 25fare, estimated

First metro from Kalighat about 06:18 · Last metro that makes every connection about 22:48

Kalighat to Dakshineshwar route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Blue Line towards Dakshineshwar
    Board at Kalighat · trains from about 06:18 to 22:48
    17 stops, about 39 min
    1. Kalighat
    2. Jatin Das Park
    3. Netaji Bhavan
    4. Rabindra Sadan
    5. Maidan
    6. Park Street
    7. Esplanade
    8. Chandni Chowk
    9. Central
    10. Mahatma Gandhi Road
    11. Girish Park
    12. Shobhabazar Sutanuti
    13. Shyambazar
    14. Belgachia
    15. Dum Dum
    16. Noapara
    17. Baranagar
    18. Dakshineshwar
    Get off at Dakshineshwar

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Kalighat to Dakshineshwar metro fare

Kolkata Metro: about Rs 25 for about 21.6 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Dakshineshwar to Kalighat

Questions about Kalighat to Dakshineshwar metro

How long does the metro take from Kalighat to Dakshineshwar?

About 39 minutes for 17 stations. Add your waiting time at the platform.

Is there a direct metro from Kalighat to Dakshineshwar?

Yes. Take the Blue Line towards Dakshineshwar; Dakshineshwar is the 17th stop.

What is the metro fare from Kalighat to Dakshineshwar?

About Rs 25 on the Kolkata Metro, estimated from a distance of about 21.6 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Kalighat to Dakshineshwar?

The first useful train leaves Kalighat at about 06:18 and the last one that still makes every connection leaves at about 22:48. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.