Netaji to Baranagar metro route
Direct on the Blue Line: 19 stations, about 44 min.
First metro from Netaji about 06:10 · Last metro that makes every connection about 22:40
Netaji to Baranagar route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Blue Line towards DakshineshwarBoard at Netaji · trains from about 06:10 to 22:40
19 stops, about 44 min
Get off at Baranagar
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Netaji to Baranagar metro fare
Kolkata Metro: about Rs 25 for about 24.1 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Netaji to Baranagar metro
How long does the metro take from Netaji to Baranagar?
About 44 minutes for 19 stations. Add your waiting time at the platform.
Is there a direct metro from Netaji to Baranagar?
Yes. Take the Blue Line towards Dakshineshwar; Baranagar is the 19th stop.
What is the metro fare from Netaji to Baranagar?
About Rs 25 on the Kolkata Metro, estimated from a distance of about 24.1 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Netaji to Baranagar?
The first useful train leaves Netaji at about 06:10 and the last one that still makes every connection leaves at about 22:40. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.