Dadar to Mahindra & Mahindra metro route
Line 3 (Aqua Line), then Line 1 (Blue Line), then walk to Andheri (West), then Line 2A (Yellow Line), then Line 7 (Red Line): 36 stations, about 1 h 31 min.
First metro from Dadar about 06:22 · Last metro that makes every connection about 21:18
Dadar to Mahindra & Mahindra route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Line 3 (Aqua Line) towards Aarey JVLRBoard at Dadar · trains from about 06:22 to 22:57
9 stops, about 22 min
Get off at Marol Naka - Change line here, allow about 4 min. These lines are run by different operators, so you need a separate ticket.
-
Line 1 (Blue Line) towards VersovaBoard at Marol Naka · trains from about 05:38 to 23:58
6 stops, about 12 min
Get off at D. N. Nagar - Walk to Andheri (West), about 5 min. You may need to leave the paid area and enter again.
-
Line 2A (Yellow Line) towards Dahisar (East)Board at Andheri (West) · trains from about 05:55 to 23:00
16 stops, about 34 min
Get off at Dahisar (East) - Change line here, allow about 4 min.
-
Line 7 (Red Line) towards GundavaliBoard at Dahisar (East) · trains from about 05:58 to 22:38
5 stops, about 11 min
Get off at Mahindra & Mahindra
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Dadar to Mahindra & Mahindra metro fare
MMRCL (Line 3): about Rs 30 for about 13.4 km, from the published fare chart.
MMOPL (Line 1): about Rs 30 for about 6.1 km, from the published fare chart.
MMMOCL (Lines 2A, 2B, 7, 9): about Rs 50 for about 24.4 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Dadar to Mahindra & Mahindra metro
How long does the metro take from Dadar to Mahindra & Mahindra?
About 91 minutes for 36 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Is there a direct metro from Dadar to Mahindra & Mahindra?
No. The trip includes a walk between stations: walk to Andheri (West).
What is the metro fare from Dadar to Mahindra & Mahindra?
About Rs 30 on the MMRCL (Line 3), estimated from a distance of about 13.4 km and the published fare slabs. About Rs 30 on the MMOPL (Line 1), estimated from a distance of about 6.1 km and the published fare slabs. About Rs 50 on the MMMOCL (Lines 2A, 2B, 7, 9), estimated from a distance of about 24.4 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Dadar to Mahindra & Mahindra?
The first useful train leaves Dadar at about 06:22 and the last one that still makes every connection leaves at about 21:18. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.