Ghatkopar to Grant Road metro route
Line 1 (Blue Line), then Line 3 (Aqua Line): 20 stations, about 48 min.
First metro from Ghatkopar about 05:30 · Last metro that makes every connection about 22:25
Ghatkopar to Grant Road route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Line 1 (Blue Line) towards VersovaBoard at Ghatkopar · trains from about 05:30 to 23:50
4 stops, about 8 min
Get off at Marol Naka - Change line here, allow about 4 min. These lines are run by different operators, so you need a separate ticket.
-
Line 3 (Aqua Line) towards Cuffe ParadeBoard at Marol Naka · trains from about 06:01 to 22:36
16 stops, about 36 min
Get off at Grant Road
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Ghatkopar to Grant Road metro fare
MMOPL (Line 1): about Rs 20 for about 4.2 km, from the published fare chart.
MMRCL (Line 3): about Rs 40 for about 22.4 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Ghatkopar to Grant Road metro
How long does the metro take from Ghatkopar to Grant Road?
About 48 minutes for 20 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Ghatkopar and Grant Road?
Yes, 1 change: at Marol Naka take the Line 3 (Aqua Line) towards Cuffe Parade.
What is the metro fare from Ghatkopar to Grant Road?
About Rs 20 on the MMOPL (Line 1), estimated from a distance of about 4.2 km and the published fare slabs. About Rs 40 on the MMRCL (Line 3), estimated from a distance of about 22.4 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Ghatkopar to Grant Road?
The first useful train leaves Ghatkopar at about 05:30 and the last one that still makes every connection leaves at about 22:25. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.