Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus metro route

Line 1 (Blue Line), then Line 3 (Aqua Line): 22 stations, about 51 min.

51 minjourney, about
22stations
1change
Rs 20fare, estimated (MMOPL (Line 1))
Rs 50fare, estimated (MMRCL (Line 3))

First metro from Jagruti Nagar about 05:32 · Last metro that makes every connection about 22:26

Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Line 1 (Blue Line) towards Versova
    Board at Jagruti Nagar · trains from about 05:32 to 23:52
    3 stops, about 6 min
    1. Jagruti Nagar
    2. Asalpha
    3. Saki Naka
    4. Marol Naka
    Get off at Marol Naka
  2. Change line here, allow about 4 min. These lines are run by different operators, so you need a separate ticket.
  3. Line 3 (Aqua Line) towards Cuffe Parade
    Board at Marol Naka · trains from about 06:01 to 22:36
    19 stops, about 42 min
    1. Marol Naka
    2. CSMIA International T2
    3. Sahar Road
    4. CSMIA Domestic
    5. Santacruz
    6. Bandra Colony
    7. Bandra Kurla Complex (BKC)
    8. Dharavi
    9. Shitala Devi Mandir
    10. Dadar
    11. Siddhivinayak Temple
    12. Worli
    13. Acharya Atre Chowk
    14. Science Museum
    15. Mahalaxmi
    16. Jagannath Shankar Sheth
    17. Grant Road
    18. Girgaon
    19. Kalbadevi
    20. Chhatrapati Shivaji Maharaj Terminus

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus metro fare

MMOPL (Line 1): about Rs 20 for about 3.2 km, from the published fare chart.

MMRCL (Line 3): about Rs 50 for about 25.7 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Chhatrapati Shivaji Maharaj Terminus to Jagruti Nagar

Questions about Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus metro

How long does the metro take from Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus?

About 51 minutes for 22 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Jagruti Nagar and Chhatrapati Shivaji Maharaj Terminus?

Yes, 1 change: at Marol Naka take the Line 3 (Aqua Line) towards Cuffe Parade.

What is the metro fare from Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus?

About Rs 20 on the MMOPL (Line 1), estimated from a distance of about 3.2 km and the published fare slabs. About Rs 50 on the MMRCL (Line 3), estimated from a distance of about 25.7 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Jagruti Nagar to Chhatrapati Shivaji Maharaj Terminus?

The first useful train leaves Jagruti Nagar at about 05:32 and the last one that still makes every connection leaves at about 22:26. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.