Saki Naka to Dahisar (East) metro route
Line 1 (Blue Line), then walk to Andheri (West), then Line 2A (Yellow Line): 23 stations, about 52 min.
First metro from Saki Naka about 05:36 · Last metro that makes every connection about 22:41
Saki Naka to Dahisar (East) route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Line 1 (Blue Line) towards VersovaBoard at Saki Naka · trains from about 05:36 to 23:56
7 stops, about 14 min
Get off at D. N. Nagar - Walk to Andheri (West), about 5 min. You may need to leave the paid area and enter again.
-
Line 2A (Yellow Line) towards Dahisar (East)Board at Andheri (West) · trains from about 05:55 to 23:00
16 stops, about 34 min
Get off at Dahisar (East)
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Saki Naka to Dahisar (East) metro fare
MMOPL (Line 1): about Rs 30 for about 7.3 km, from the published fare chart.
MMMOCL (Lines 2A, 2B, 7, 9): about Rs 40 for about 18.6 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Saki Naka to Dahisar (East) metro
How long does the metro take from Saki Naka to Dahisar (East)?
About 52 minutes for 23 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Is there a direct metro from Saki Naka to Dahisar (East)?
No. The trip includes a walk between stations: walk to Andheri (West).
What is the metro fare from Saki Naka to Dahisar (East)?
About Rs 30 on the MMOPL (Line 1), estimated from a distance of about 7.3 km and the published fare slabs. About Rs 40 on the MMMOCL (Lines 2A, 2B, 7, 9), estimated from a distance of about 18.6 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Saki Naka to Dahisar (East)?
The first useful train leaves Saki Naka at about 05:36 and the last one that still makes every connection leaves at about 22:41. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.