Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Ghaziabad to Shatabdi Nagar metro route

Direct on the Delhi-Meerut Namo Bharat corridor: 7 stations, about 31 min.

31 minjourney, about
7stations
Directno change
+ fareNamo Bharat (Delhi-Meerut RRTS), separate

First metro from Ghaziabad about 06:16 · Last metro that makes every connection about 22:16

Ghaziabad to Shatabdi Nagar route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Board at Ghaziabad · trains from about 06:16 to 22:16
    7 stops, about 31 min
    1. Ghaziabad
    2. Guldhar
    3. Duhai
    4. Murad Nagar
    5. Modinagar South
    6. Modinagar North
    7. Meerut South
    8. Shatabdi Nagar
    Get off at Shatabdi Nagar

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

Shatabdi Nagar to Ghaziabad

Questions about Ghaziabad to Shatabdi Nagar metro

How long does the metro take from Ghaziabad to Shatabdi Nagar?

About 31 minutes for 7 stations. Add your waiting time at the platform.

Is there a direct metro from Ghaziabad to Shatabdi Nagar?

Yes. Take the Delhi-Meerut Namo Bharat corridor towards Modipuram; Shatabdi Nagar is the 7th stop.

What are the first and last metro times from Ghaziabad to Shatabdi Nagar?

The first useful train leaves Ghaziabad at about 06:16 and the last one that still makes every connection leaves at about 22:16. These are estimates from the line timings, so check the last train at the station.

Timings and fares: National Capital Region Transport Corporation (NCRTC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.