Modinagar North to Ghaziabad metro route
Direct on the Delhi-Meerut Namo Bharat corridor: 5 stations, about 19 min.
First metro from Modinagar North about 06:23 · Last metro that makes every connection about 22:23
Modinagar North to Ghaziabad route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Delhi-Meerut Namo Bharat corridor towards Sarai Kale KhanBoard at Modinagar North · trains from about 06:23 to 22:23
5 stops, about 19 min
Get off at Ghaziabad
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about Modinagar North to Ghaziabad metro
How long does the metro take from Modinagar North to Ghaziabad?
About 19 minutes for 5 stations. Add your waiting time at the platform.
Is there a direct metro from Modinagar North to Ghaziabad?
Yes. Take the Delhi-Meerut Namo Bharat corridor towards Sarai Kale Khan; Ghaziabad is the 5th stop.
What are the first and last metro times from Modinagar North to Ghaziabad?
The first useful train leaves Modinagar North at about 06:23 and the last one that still makes every connection leaves at about 22:23. These are estimates from the line timings, so check the last train at the station.
Timings and fares: National Capital Region Transport Corporation (NCRTC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.