Shatabdi Nagar to Modinagar North metro route
Direct on the Delhi-Meerut Namo Bharat corridor: 2 stations, about 11 min.
First metro from Shatabdi Nagar about 06:11 · Last metro that makes every connection about 22:11
Shatabdi Nagar to Modinagar North route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Delhi-Meerut Namo Bharat corridor towards Sarai Kale KhanBoard at Shatabdi Nagar · trains from about 06:11 to 22:11
2 stops, about 11 min
Get off at Modinagar North
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about Shatabdi Nagar to Modinagar North metro
How long does the metro take from Shatabdi Nagar to Modinagar North?
About 11 minutes for 2 stations. Add your waiting time at the platform.
Is there a direct metro from Shatabdi Nagar to Modinagar North?
Yes. Take the Delhi-Meerut Namo Bharat corridor towards Sarai Kale Khan; Modinagar North is the 2nd stop.
What are the first and last metro times from Shatabdi Nagar to Modinagar North?
The first useful train leaves Shatabdi Nagar at about 06:11 and the last one that still makes every connection leaves at about 22:11. These are estimates from the line timings, so check the last train at the station.
Timings and fares: National Capital Region Transport Corporation (NCRTC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.