CBD Belapur to Pethpada metro route
Direct on the Line 1: 7 stations, about 14 min.
First metro from CBD Belapur about 06:00 · Last metro that makes every connection about 22:00
CBD Belapur to Pethpada route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Line 1 towards PendharBoard at CBD Belapur · trains from about 06:00 to 22:00
7 stops, about 14 min
Get off at Pethpada
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
CBD Belapur to Pethpada metro fare
Navi Mumbai Metro: about Rs 20 for about 7.8 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about CBD Belapur to Pethpada metro
How long does the metro take from CBD Belapur to Pethpada?
About 14 minutes for 7 stations. Add your waiting time at the platform.
Is there a direct metro from CBD Belapur to Pethpada?
Yes. Take the Line 1 towards Pendhar; Pethpada is the 7th stop.
What is the metro fare from CBD Belapur to Pethpada?
About Rs 20 on the Navi Mumbai Metro, estimated from a distance of about 7.8 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from CBD Belapur to Pethpada?
The first useful train leaves CBD Belapur at about 06:00 and the last one that still makes every connection leaves at about 22:00. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Maha Metro (Maharashtra Metro Rail Corporation Ltd) for CIDCO (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.