Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Mangalwar Peth to Bund Garden metro route

Direct on the Aqua Line (Line 2): 3 stations, about 7 min.

7 minjourney, about
3stations
Directno change
+ farePune Metro, separate

First metro from Mangalwar Peth about 06:20 · Last metro that makes every connection about 23:20

Mangalwar Peth to Bund Garden route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Aqua Line (Line 2) towards Ramwadi
    Board at Mangalwar Peth · trains from about 06:20 to 23:20
    3 stops, about 7 min
    1. Mangalwar Peth
    2. Pune Railway Station
    3. Ruby Hall Clinic
    4. Bund Garden
    Get off at Bund Garden

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

Bund Garden to Mangalwar Peth

Questions about Mangalwar Peth to Bund Garden metro

How long does the metro take from Mangalwar Peth to Bund Garden?

About 7 minutes for 3 stations. Add your waiting time at the platform.

Is there a direct metro from Mangalwar Peth to Bund Garden?

Yes. Take the Aqua Line (Line 2) towards Ramwadi; Bund Garden is the 3rd stop.

What are the first and last metro times from Mangalwar Peth to Bund Garden?

The first useful train leaves Mangalwar Peth at about 06:20 and the last one that still makes every connection leaves at about 23:20. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.