Mangalwar Peth to Sant Tukaram Nagar metro route
Aqua Line (Line 2), then Purple Line (Line 1): 9 stations, about 30 min.
First metro from Mangalwar Peth about 06:18 · Last metro that makes every connection about 23:00
Mangalwar Peth to Sant Tukaram Nagar route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Aqua Line (Line 2) towards VanazBoard at Mangalwar Peth · trains from about 06:18 to 23:181 stop, about 2 minGet off at District Court
- Change line here, allow about 4 min.
-
Purple Line (Line 1) towards PCMC BhavanBoard at District Court · trains from about 06:07 to 23:07
8 stops, about 23 min
Get off at Sant Tukaram Nagar
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about Mangalwar Peth to Sant Tukaram Nagar metro
How long does the metro take from Mangalwar Peth to Sant Tukaram Nagar?
About 30 minutes for 9 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Mangalwar Peth and Sant Tukaram Nagar?
Yes, 1 change: at District Court take the Purple Line (Line 1) towards PCMC Bhavan.
What are the first and last metro times from Mangalwar Peth to Sant Tukaram Nagar?
The first useful train leaves Mangalwar Peth at about 06:18 and the last one that still makes every connection leaves at about 23:00. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.