Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

PCMC Bhavan to कसबा पेठ metro route

Direct on the Purple Line (Line 1): 10 stations, about 29 min.

29 minjourney, about
10stations
Directno change
+ farePune Metro, separate

First metro from PCMC Bhavan about 06:00 · Last metro that makes every connection about 23:00

PCMC Bhavan to कसबा पेठ route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Purple Line (Line 1) towards Swargate
    Board at PCMC Bhavan · trains from about 06:00 to 23:00
    10 stops, about 29 min
    1. PCMC Bhavan
    2. Sant Tukaram Nagar
    3. Nashik Phata
    4. Kasarwadi
    5. Phugewadi
    6. Dapodi
    7. Bopodi
    8. Khadki
    9. Shivaji Nagar
    10. District Court
    11. कसबा पेठ

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

कसबा पेठ to PCMC Bhavan

Questions about PCMC Bhavan to कसबा पेठ metro

How long does the metro take from PCMC Bhavan to कसबा पेठ?

About 29 minutes for 10 stations. Add your waiting time at the platform.

Is there a direct metro from PCMC Bhavan to कसबा पेठ?

Yes. Take the Purple Line (Line 1) towards Swargate; कसबा पेठ is the 10th stop.

What are the first and last metro times from PCMC Bhavan to कसबा पेठ?

The first useful train leaves PCMC Bhavan at about 06:00 and the last one that still makes every connection leaves at about 23:00. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.