Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Shivaji Nagar to PCMC Bhavan metro route

Direct on the Purple Line (Line 1): 8 stations, about 25 min.

25 minjourney, about
8stations
Directno change
+ farePune Metro, separate

First metro from Shivaji Nagar about 06:09 · Last metro that makes every connection about 23:09

Shivaji Nagar to PCMC Bhavan route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Purple Line (Line 1) towards PCMC Bhavan
    Board at Shivaji Nagar · trains from about 06:09 to 23:09
    8 stops, about 25 min
    1. Shivaji Nagar
    2. Khadki
    3. Bopodi
    4. Dapodi
    5. Phugewadi
    6. Kasarwadi
    7. Nashik Phata
    8. Sant Tukaram Nagar
    9. PCMC Bhavan
    Get off at PCMC Bhavan

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

PCMC Bhavan to Shivaji Nagar

Questions about Shivaji Nagar to PCMC Bhavan metro

How long does the metro take from Shivaji Nagar to PCMC Bhavan?

About 25 minutes for 8 stations. Add your waiting time at the platform.

Is there a direct metro from Shivaji Nagar to PCMC Bhavan?

Yes. Take the Purple Line (Line 1) towards PCMC Bhavan; PCMC Bhavan is the 8th stop.

What are the first and last metro times from Shivaji Nagar to PCMC Bhavan?

The first useful train leaves Shivaji Nagar at about 06:09 and the last one that still makes every connection leaves at about 23:09. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.