Akurli metro station
Mumbai Metro station on Line 7 (Red Line). First and last trains in each direction, how often they run and routes to popular stations.
First and last metro from Akurli
| Line and direction | First train | Last train |
|---|---|---|
| Line 7 (Red Line) towards Gundavali |
06:10 | 22:50 |
| Line 7 (Red Line) towards Dahisar (East) |
06:18 | 23:18 |
Worked out from the operator's first and last departures at each end of the line plus running time, so allow a few minutes either way. Confirm the last train at the station.
Line 7 (Red Line): every 5.83 min at peak, 9.5 min off-peak.
Metro from Akurli to popular stations
| To | Time | Changes |
|---|---|---|
| Akurli to Dahisar (East) | 12 min | Direct |
| Akurli to Ghatkopar | 1 h 14 min | 2 |
| Akurli to Gundavali | 18 min | Direct |
| Akurli to Airport Road | 1 h 5 min | 2 |
| Akurli to Andheri | 59 min | 2 |
| Akurli to Dadar | 1 h 32 min | 3 |
| Akurli to Devipada | 6 min | Direct |
| Akurli to Jagruti Nagar | 1 h 12 min | 2 |
| Akurli to Mahalaxmi | 1 h 43 min | 3 |
| Akurli to Marol Naka | 1 h 7 min | 2 |
| Akurli to Rashtriya Udyan | 8 min | Direct |
| Akurli to Siddhivinayak Temple | 1 h 34 min | 3 |
Near Akurli metro station
Other metro stations: Mahindra & Mahindra 668 m, Kurar 1266 m
Straight-line distances; the walking route is longer.
Questions about Akurli metro station
What time is the first metro from Akurli?
The first train leaves Akurli at about 06:10 towards Gundavali (Line 7 (Red Line)) and 06:18 towards Dahisar (East) (Line 7 (Red Line)). These times are worked out from the published first and last departures at each end of the line plus the running time to this station, so allow a few minutes either way.
What time is the last metro from Akurli?
The last train leaves Akurli at about 22:50 towards Gundavali (Line 7 (Red Line)) and 23:18 towards Dahisar (East) (Line 7 (Red Line)). Last trains are the ones most worth confirming at the station on the day.
Which metro line is Akurli on?
Akurli is on the Line 7 (Red Line) of the Mumbai Metro.
How often do trains run at Akurli?
On the Line 7 (Red Line), trains run every 5.83 minutes at peak times and every 9.5 minutes at other times.
Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.