D. N. Nagar to Gundavali metro route
walk to Andheri (West), then Line 2A (Yellow Line), then Line 7 (Red Line): 29 stations, about 1 h 13 min.
First metro from D. N. Nagar about 05:55 · Last metro that makes every connection about 21:59
D. N. Nagar to Gundavali route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
- Walk to Andheri (West), about 5 min. You may need to leave the paid area and enter again.
-
Line 2A (Yellow Line) towards Dahisar (East)Board at Andheri (West) · trains from about 05:55 to 23:00
16 stops, about 34 min
Get off at Dahisar (East) - Change line here, allow about 4 min.
-
Line 7 (Red Line) towards GundavaliBoard at Dahisar (East) · trains from about 05:58 to 22:38
13 stops, about 31 min
Get off at Gundavali
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
D. N. Nagar to Gundavali metro fare
MMMOCL (Lines 2A, 2B, 7, 9): about Rs 60 for about 35.1 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about D. N. Nagar to Gundavali metro
How long does the metro take from D. N. Nagar to Gundavali?
About 73 minutes for 29 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Is there a direct metro from D. N. Nagar to Gundavali?
No. The trip includes a walk between stations: walk to Andheri (West).
What is the metro fare from D. N. Nagar to Gundavali?
About Rs 60 on the MMMOCL (Lines 2A, 2B, 7, 9), estimated from a distance of about 35.1 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from D. N. Nagar to Gundavali?
The first useful train leaves D. N. Nagar at about 05:55 and the last one that still makes every connection leaves at about 21:59. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.