Mahindra & Mahindra to Gundavali metro route
Direct on the Line 7 (Red Line): 8 stations, about 20 min.
First metro from Mahindra & Mahindra about 06:09 · Last metro that makes every connection about 22:49
Mahindra & Mahindra to Gundavali route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Line 7 (Red Line) towards GundavaliBoard at Mahindra & Mahindra · trains from about 06:09 to 22:49
8 stops, about 20 min
Get off at Gundavali
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Mahindra & Mahindra to Gundavali metro fare
MMMOCL (Lines 2A, 2B, 7, 9): about Rs 20 for about 10.7 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Mahindra & Mahindra to Gundavali metro
How long does the metro take from Mahindra & Mahindra to Gundavali?
About 20 minutes for 8 stations. Add your waiting time at the platform.
Is there a direct metro from Mahindra & Mahindra to Gundavali?
Yes. Take the Line 7 (Red Line) towards Gundavali; Gundavali is the 8th stop.
What is the metro fare from Mahindra & Mahindra to Gundavali?
About Rs 20 on the MMMOCL (Lines 2A, 2B, 7, 9), estimated from a distance of about 10.7 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Mahindra & Mahindra to Gundavali?
The first useful train leaves Mahindra & Mahindra at about 06:09 and the last one that still makes every connection leaves at about 22:49. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.