Hinjewadi Phase I to Pune Railway Station metro route
Pink Line (Line 3), then Aqua Line (Line 2): 11 stations, about 39 min.
First metro from Hinjewadi Phase I about 06:15 · Last metro that makes every connection about 22:42
Hinjewadi Phase I to Pune Railway Station route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Pink Line (Line 3) towards District CourtBoard at Hinjewadi Phase I · trains from about 06:15 to 23:15
9 stops, about 31 min
Get off at District Court - Change line here, allow about 4 min.
-
Aqua Line (Line 2) towards RamwadiBoard at District Court · trains from about 06:17 to 23:17
2 stops, about 4 min
Get off at Pune Railway Station
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about Hinjewadi Phase I to Pune Railway Station metro
How long does the metro take from Hinjewadi Phase I to Pune Railway Station?
About 39 minutes for 11 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Hinjewadi Phase I and Pune Railway Station?
Yes, 1 change: at District Court take the Aqua Line (Line 2) towards Ramwadi.
What are the first and last metro times from Hinjewadi Phase I to Pune Railway Station?
The first useful train leaves Hinjewadi Phase I at about 06:15 and the last one that still makes every connection leaves at about 22:42. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-11-15. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.