Monday, 16 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus
Darbhanga Jn railway station (DBG), where train 02569 starts
Photo: RKV, CC BY-SA 3.0
Train No. 02569 · Special

02569 DBG NDLS Special Running Status (DBG to NDLS)

Darbhanga Jn to New Delhi · 1171 km · 11 stops · Runs Daily

Checking live position…

The full timetable is below while live data loads.

Get live updates on WhatsApp
Never miss your stopNever miss your stop
Arrival
Station
Departure
  1. Day 1
  2. Start
    Darbhanga Jn
    DBG · 0 km
    06:30
  3. 07:50
    Samastipur Jn
    SPJ · 37 km · 25 min halt
    08:15
  4. 09:05
    Muzaffarpur Jn
    MFP · 89 km · 5 min halt
    09:10
  5. 11:27
    Chhapra
    CPR · 202 km · 5 min halt
    11:32
  6. 12:18
    Siwan Jn
    SV · 263 km · 2 min halt
    12:20
  7. 13:12
    Deoria Sadar
    DEOS · 333 km · 2 min halt
    13:14
  8. 14:20
    Gorakhpur Jn
    GKP · 383 km · 10 min halt
    14:30
  9. 15:34
    Basti
    BST · 447 km · 3 min halt
    15:37
  10. 19:55
    Aishbagh
    ASH · 658 km · 10 min halt
    20:05
  11. 21:35
    Kanpur Central
    CNB · 730 km · 5 min halt
    21:40
  12. Day 2
  13. 04:30
    New Delhi
    NDLS · 1171 km
    End

Check seats on 02569

Waitlisted? The percentage is the estimated chance of confirmation. Seats can also open up from a nearby station: open the trip planner.

02569 route map

Stations plotted in order. The line joins stops directly and does not trace the exact track. Map data © OpenStreetMap contributors.

02569 coach position

ENG 
LPR 
M13E
M23E
M33E
M43E
M53E
B13A
B23A
B33A
B43A
B53A
B63A
B73A
S1SL
S2SL
S3SL
S4SL
SLRD 

Order from the engine, as last seen on 2026-10-30. Confirm on the platform coach indicator. What do the codes mean?

How late does 02569 usually run?

3h 7m latetypical delay, last 53 days
0%days within 15 minutes
5h 30m lateworst delay seen (2026-11-15)
3h 12m latemedian delay
50days over 1 hour late
2days cancelled

Based on recent days, 02569 usually reaches New Delhi about 3h 7m late. When the train is running, the live card at the top shows a fresh estimate for today.

Last 7 days: typically 3h 53m late, against 2h 56m late the week before, so it has been running later recently.

Tracked from 2026-09-25 to 2026-11-16. Each bar is one day, oldest on the left. Taken from our own live snapshots every 15 minutes at major stations, so a few trains on quiet routes may have gaps.

New to train travel?New to train travel?

DBG NDLS Special: common questions

What time does 02569 leave Darbhanga Jn?

02569 DBG NDLS Special is scheduled to depart Darbhanga Jn (DBG) at 06:30 and reach New Delhi (NDLS) at 04:30 on day 2, a journey of about 22 h 00 min.

On which days does 02569 run?

It runs daily.

How many stops does 02569 have?

11 scheduled halts over 1171 km, including Samastipur Jn, Muzaffarpur Jn, Chhapra.

What is the return train?

The return service is 02570 NDLS DBG SF Special from New Delhi to Darbhanga Jn.

Does 02569 DBG NDLS Special usually run late?

In the 53 days we tracked (2026-09-25 to 2026-11-16), 02569 was within 15 minutes of schedule on 0% of days. Its typical delay was 3 h 07 min (median 3 h 12 min), and the worst we saw was 5 h 30 min on 2026-11-15. It was cancelled on 2 of those days.

Timetable valid from 01-Oct-2026. Timings can change for maintenance, diversions or special notices, so check the live status on the day of travel.

From the blog