Koba Gam metro station
Ahmedabad Metro (Ahmedabad-Gandhinagar) station on Yellow Line (Line 3, Phase 2 Corridor-1). First and last trains in each direction, how often they run and routes to popular stations.
First and last metro from Koba Gam
| Line and direction | First train | Last train |
|---|---|---|
| Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma Mandir |
07:09 | 21:34 |
| Yellow Line (Line 3, Phase 2 Corridor-1) towards Koteshwar Road |
07:09 | 21:29 |
Worked out from the operator's first and last departures at each end of the line plus running time, so allow a few minutes either way. Confirm the last train at the station.
Yellow Line (Line 3, Phase 2 Corridor-1): every 24 min at peak, 40 min off-peak.
Metro from Koba Gam to popular stations
| To | Time | Changes |
|---|---|---|
| Koba Gam to GNLU | 2 min | Direct |
| Koba Gam to Koteshwar Road | 14 min | Direct |
| Koba Gam to Mahatma Mandir | 29 min | Direct |
| Koba Gam to AEC | 25 min | 1 |
| Koba Gam to Gandhigram | 42 min | 1 |
| Koba Gam to Kalupur Railway Station | 54 min | 2 |
| Koba Gam to Old High Court | 39 min | 1 |
| Koba Gam to Paldi | 44 min | 1 |
| Koba Gam to Sabarmati | 23 min | 1 |
| Koba Gam to APMC | 53 min | 1 |
| Koba Gam to GIFT City | 12 min | 1 |
| Koba Gam to Thaltej Gam | 58 min | 2 |
Near Koba Gam metro station
Other metro stations: Juna Koba 828 m, GNLU 847 m
Straight-line distances; the walking route is longer.
Questions about Koba Gam metro station
What time is the first metro from Koba Gam?
The first train leaves Koba Gam at about 07:09 towards Mahatma Mandir (Yellow Line (Line 3, Phase 2 Corridor-1)) and 07:09 towards Koteshwar Road (Yellow Line (Line 3, Phase 2 Corridor-1)). These times are worked out from the published first and last departures at each end of the line plus the running time to this station, so allow a few minutes either way.
What time is the last metro from Koba Gam?
The last train leaves Koba Gam at about 21:34 towards Mahatma Mandir (Yellow Line (Line 3, Phase 2 Corridor-1)) and 21:29 towards Koteshwar Road (Yellow Line (Line 3, Phase 2 Corridor-1)). Last trains are the ones most worth confirming at the station on the day.
Which metro line is Koba Gam on?
Koba Gam is on the Yellow Line (Line 3, Phase 2 Corridor-1) of the Ahmedabad Metro (Ahmedabad-Gandhinagar).
How often do trains run at Koba Gam?
On the Yellow Line (Line 3, Phase 2 Corridor-1), trains run every 24 minutes at peak times and every 40 minutes at other times.
Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.