Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Ahmedabad Metro Yellow Line (Line 3, Phase 2 Corridor-1): stations, route and timings

Yellow Line (Line 3, Phase 2 Corridor-1) (yellow on the map) runs from Koteshwar Road to Mahatma Mandir with 20 stations.

20stations
21.8 kmlength
43 minend to end, about
24 minpeak frequency

Yellow Line (Line 3, Phase 2 Corridor-1) stations list

From Koteshwar Road: first 06:55, last 21:20. From Mahatma Mandir: first 06:40, last 21:00.

  1. Koteshwar Road start Red Line (Line 2, North-South Corridor)
  2. Vishwakarma College 3 min
  3. Tapovan Circle 5 min
  4. Narmada Canal 7 min
  5. Koba Circle 10 min
  6. Juna Koba 12 min
  7. Koba Gam 14 min
  8. GNLU 16 min Violet Line (Line 4, Phase 2 Corridor-2)
  9. Raysan 19 min
  10. Randesan 22 min
  11. Dholakuva Circle 24 min
  12. Infocity 25 min
  13. Sector-1 28 min
  14. Sector-10A 30 min
  15. Sachivalaya 32 min
  16. Akshardham 35 min
  17. Juna Sachivalaya 36 min
  18. Sector-16 39 min
  19. Sector-24 41 min
  20. Mahatma Mandir 43 min Railway: Gandhinagar Capital

Minutes are approximate running time from Koteshwar Road.

New to train travel?New to train travel?

Yellow Line (Line 3, Phase 2 Corridor-1) map

Map loads when you scroll here.

Plan a Ahmedabad metro journey

Questions about the Yellow Line (Line 3, Phase 2 Corridor-1)

How many stations are on the Ahmedabad Metro Yellow Line (Line 3, Phase 2 Corridor-1)?

The Yellow Line (Line 3, Phase 2 Corridor-1) has 20 stations from Koteshwar Road to Mahatma Mandir.

What are the Yellow Line (Line 3, Phase 2 Corridor-1) first and last train timings?

From koteshwar road the first train is at 06:55 and the last at 21:20; from mahatma mandir the first train is at 06:40 and the last at 21:00.

How often does the Yellow Line (Line 3, Phase 2 Corridor-1) run?

Trains run every 24 minutes at peak times and every 40 minutes at other times.

Where can I change from the Yellow Line (Line 3, Phase 2 Corridor-1) to other lines?

Interchange stations on the Yellow Line (Line 3, Phase 2 Corridor-1): Koteshwar Road (Red Line (Line 2, North-South Corridor)) and GNLU (Violet Line (Line 4, Phase 2 Corridor-2)).

What colour is the Yellow Line (Line 3, Phase 2 Corridor-1) on the Ahmedabad metro map?

Yellow.

Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.