Raysan metro station
Ahmedabad Metro (Ahmedabad-Gandhinagar) station on Yellow Line (Line 3, Phase 2 Corridor-1). First and last trains in each direction, how often they run and routes to popular stations.
First and last metro from Raysan
| Line and direction | First train | Last train |
|---|---|---|
| Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma Mandir |
07:14 | 21:39 |
| Yellow Line (Line 3, Phase 2 Corridor-1) towards Koteshwar Road |
07:04 | 21:24 |
Worked out from the operator's first and last departures at each end of the line plus running time, so allow a few minutes either way. Confirm the last train at the station.
Yellow Line (Line 3, Phase 2 Corridor-1): every 24 min at peak, 40 min off-peak.
Metro from Raysan to popular stations
| To | Time | Changes |
|---|---|---|
| Raysan to GNLU | 3 min | Direct |
| Raysan to Koteshwar Road | 19 min | Direct |
| Raysan to Mahatma Mandir | 24 min | Direct |
| Raysan to AEC | 30 min | 1 |
| Raysan to Gandhigram | 46 min | 1 |
| Raysan to Kalupur Railway Station | 58 min | 2 |
| Raysan to Old High Court | 44 min | 1 |
| Raysan to Paldi | 49 min | 1 |
| Raysan to Sabarmati | 27 min | 1 |
| Raysan to APMC | 58 min | 1 |
| Raysan to GIFT City | 13 min | 1 |
| Raysan to Thaltej Gam | 1 h 3 min | 2 |
Near Raysan metro station
Other metro stations: GNLU 1329 m, Randesan 1415 m
Straight-line distances; the walking route is longer.
Questions about Raysan metro station
What time is the first metro from Raysan?
The first train leaves Raysan at about 07:14 towards Mahatma Mandir (Yellow Line (Line 3, Phase 2 Corridor-1)) and 07:04 towards Koteshwar Road (Yellow Line (Line 3, Phase 2 Corridor-1)). These times are worked out from the published first and last departures at each end of the line plus the running time to this station, so allow a few minutes either way.
What time is the last metro from Raysan?
The last train leaves Raysan at about 21:39 towards Mahatma Mandir (Yellow Line (Line 3, Phase 2 Corridor-1)) and 21:24 towards Koteshwar Road (Yellow Line (Line 3, Phase 2 Corridor-1)). Last trains are the ones most worth confirming at the station on the day.
Which metro line is Raysan on?
Raysan is on the Yellow Line (Line 3, Phase 2 Corridor-1) of the Ahmedabad Metro (Ahmedabad-Gandhinagar).
How often do trains run at Raysan?
On the Yellow Line (Line 3, Phase 2 Corridor-1), trains run every 24 minutes at peak times and every 40 minutes at other times.
Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.