Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Gitanjali to Rabindra Sarobar metro route

Direct on the Blue Line: 4 stations, about 11 min.

11 minjourney, about
4stations
Directno change
Rs 15fare, estimated

First metro from Gitanjali about 06:05 · Last metro that makes every connection about 22:35

Gitanjali to Rabindra Sarobar route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Blue Line towards Dakshineshwar
    Board at Gitanjali · trains from about 06:05 to 22:35
    4 stops, about 11 min
    1. Gitanjali
    2. Masterda Surya Sen
    3. Netaji
    4. Mahanayak Uttam Kumar
    5. Rabindra Sarobar
    Get off at Rabindra Sarobar

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Gitanjali to Rabindra Sarobar metro fare

Kolkata Metro: about Rs 15 for about 6.5 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Rabindra Sarobar to Gitanjali

Questions about Gitanjali to Rabindra Sarobar metro

How long does the metro take from Gitanjali to Rabindra Sarobar?

About 11 minutes for 4 stations. Add your waiting time at the platform.

Is there a direct metro from Gitanjali to Rabindra Sarobar?

Yes. Take the Blue Line towards Dakshineshwar; Rabindra Sarobar is the 4th stop.

What is the metro fare from Gitanjali to Rabindra Sarobar?

About Rs 15 on the Kolkata Metro, estimated from a distance of about 6.5 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Gitanjali to Rabindra Sarobar?

The first useful train leaves Gitanjali at about 06:05 and the last one that still makes every connection leaves at about 22:35. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.