Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Gitanjali to Shyambazar metro route

Direct on the Blue Line: 17 stations, about 34 min.

34 minjourney, about
17stations
Directno change
Rs 20fare, estimated

First metro from Gitanjali about 06:05 · Last metro that makes every connection about 22:35

Gitanjali to Shyambazar route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Blue Line towards Dakshineshwar
    Board at Gitanjali · trains from about 06:05 to 22:35
    17 stops, about 34 min
    1. Gitanjali
    2. Masterda Surya Sen
    3. Netaji
    4. Mahanayak Uttam Kumar
    5. Rabindra Sarobar
    6. Kalighat
    7. Jatin Das Park
    8. Netaji Bhavan
    9. Rabindra Sadan
    10. Maidan
    11. Park Street
    12. Esplanade
    13. Chandni Chowk
    14. Central
    15. Mahatma Gandhi Road
    16. Girish Park
    17. Shobhabazar Sutanuti
    18. Shyambazar
    Get off at Shyambazar

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Gitanjali to Shyambazar metro fare

Kolkata Metro: about Rs 20 for about 19.0 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Shyambazar to Gitanjali

Questions about Gitanjali to Shyambazar metro

How long does the metro take from Gitanjali to Shyambazar?

About 34 minutes for 17 stations. Add your waiting time at the platform.

Is there a direct metro from Gitanjali to Shyambazar?

Yes. Take the Blue Line towards Dakshineshwar; Shyambazar is the 17th stop.

What is the metro fare from Gitanjali to Shyambazar?

About Rs 20 on the Kolkata Metro, estimated from a distance of about 19.0 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Gitanjali to Shyambazar?

The first useful train leaves Gitanjali at about 06:05 and the last one that still makes every connection leaves at about 22:35. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.