Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Mahatma Gandhi Road to Central metro route

Direct on the Blue Line: 1 stations, about 2 min.

2 minjourney, about
1stations
Directno change
Rs 5fare, estimated

First metro from Mahatma Gandhi Road about 06:24 · Last metro that makes every connection about 22:54

Mahatma Gandhi Road to Central route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Blue Line towards Shahid Khudiram
    Board at Mahatma Gandhi Road · trains from about 06:24 to 22:54
    1 stop, about 2 min
    Get off at Central

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Mahatma Gandhi Road to Central metro fare

Kolkata Metro: about Rs 5 for about 1.1 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Central to Mahatma Gandhi Road

Questions about Mahatma Gandhi Road to Central metro

How long does the metro take from Mahatma Gandhi Road to Central?

About 2 minutes for 1 stations. Add your waiting time at the platform.

Is there a direct metro from Mahatma Gandhi Road to Central?

Yes. Take the Blue Line towards Shahid Khudiram; Central is the 1st stop.

What is the metro fare from Mahatma Gandhi Road to Central?

About Rs 5 on the Kolkata Metro, estimated from a distance of about 1.1 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Mahatma Gandhi Road to Central?

The first useful train leaves Mahatma Gandhi Road at about 06:24 and the last one that still makes every connection leaves at about 22:54. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.