Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Salt Lake Sector V to Gitanjali metro route

Green Line, then Blue Line: 19 stations, about 48 min.

48 minjourney, about
19stations
1change
Rs 25fare, estimated

First metro from Salt Lake Sector V about 06:00 · Last metro that makes every connection about 22:30

Salt Lake Sector V to Gitanjali route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Green Line towards Howrah Maidan
    Board at Salt Lake Sector V · trains from about 06:00 to 22:30
    8 stops, about 20 min
    1. Salt Lake Sector V
    2. Karunamoyee
    3. Central Park
    4. City Centre
    5. Bengal Chemical
    6. Salt Lake Stadium
    7. Phoolbagan
    8. Sealdah
    9. Esplanade
    Get off at Esplanade
  2. Change line here, allow about 4 min.
  3. Blue Line towards Shahid Khudiram
    Board at Esplanade · trains from about 06:28 to 22:58
    11 stops, about 24 min
    1. Esplanade
    2. Park Street
    3. Maidan
    4. Rabindra Sadan
    5. Netaji Bhavan
    6. Jatin Das Park
    7. Kalighat
    8. Rabindra Sarobar
    9. Mahanayak Uttam Kumar
    10. Netaji
    11. Masterda Surya Sen
    12. Gitanjali
    Get off at Gitanjali

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Salt Lake Sector V to Gitanjali metro fare

Kolkata Metro: about Rs 25 for about 24.6 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Gitanjali to Salt Lake Sector V

Questions about Salt Lake Sector V to Gitanjali metro

How long does the metro take from Salt Lake Sector V to Gitanjali?

About 48 minutes for 19 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Salt Lake Sector V and Gitanjali?

Yes, 1 change: at Esplanade take the Blue Line towards Shahid Khudiram.

What is the metro fare from Salt Lake Sector V to Gitanjali?

About Rs 25 on the Kolkata Metro, estimated from a distance of about 24.6 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Salt Lake Sector V to Gitanjali?

The first useful train leaves Salt Lake Sector V at about 06:00 and the last one that still makes every connection leaves at about 22:30. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Metro Railway, Kolkata (Indian Railways) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.