Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Marol Naka to Aarey JVLR metro route

Direct on the Line 3 (Aqua Line): 3 stations, about 6 min.

6 minjourney, about
3stations
Directno change
Rs 20fare, estimated

First metro from Marol Naka about 06:44 · Last metro that makes every connection about 23:18

Marol Naka to Aarey JVLR route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Line 3 (Aqua Line) towards Aarey JVLR
    Board at Marol Naka · trains from about 06:44 to 23:18
    3 stops, about 6 min
    1. Marol Naka
    2. MIDC - Andheri
    3. SEEPZ
    4. Aarey JVLR
    Get off at Aarey JVLR

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Marol Naka to Aarey JVLR metro fare

MMRCL (Line 3): about Rs 20 for about 3.8 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Aarey JVLR to Marol Naka

Questions about Marol Naka to Aarey JVLR metro

How long does the metro take from Marol Naka to Aarey JVLR?

About 6 minutes for 3 stations. Add your waiting time at the platform.

Is there a direct metro from Marol Naka to Aarey JVLR?

Yes. Take the Line 3 (Aqua Line) towards Aarey JVLR; Aarey JVLR is the 3rd stop.

What is the metro fare from Marol Naka to Aarey JVLR?

About Rs 20 on the MMRCL (Line 3), estimated from a distance of about 3.8 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Marol Naka to Aarey JVLR?

The first useful train leaves Marol Naka at about 06:44 and the last one that still makes every connection leaves at about 23:18. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.