Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

MIDC - Andheri to Marol Naka metro route

Direct on the Line 3 (Aqua Line): 1 stations, about 2 min.

2 minjourney, about
1stations
Directno change
Rs 10fare, estimated

First metro from MIDC - Andheri about 05:59 · Last metro that makes every connection about 22:34

MIDC - Andheri to Marol Naka route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Line 3 (Aqua Line) towards Cuffe Parade
    Board at MIDC - Andheri · trains from about 05:59 to 22:34
    1 stop, about 2 min
    Get off at Marol Naka

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

MIDC - Andheri to Marol Naka metro fare

MMRCL (Line 3): about Rs 10 for about 1.4 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Marol Naka to MIDC - Andheri

Questions about MIDC - Andheri to Marol Naka metro

How long does the metro take from MIDC - Andheri to Marol Naka?

About 2 minutes for 1 stations. Add your waiting time at the platform.

Is there a direct metro from MIDC - Andheri to Marol Naka?

Yes. Take the Line 3 (Aqua Line) towards Cuffe Parade; Marol Naka is the 1st stop.

What is the metro fare from MIDC - Andheri to Marol Naka?

About Rs 10 on the MMRCL (Line 3), estimated from a distance of about 1.4 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from MIDC - Andheri to Marol Naka?

The first useful train leaves MIDC - Andheri at about 05:59 and the last one that still makes every connection leaves at about 22:34. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Multiple: Mumbai Metro One Pvt Ltd (Line 1), Maha Mumbai Metro Operation Corporation Ltd (Lines 2A, 2B, 7, 9), Mumbai Metro Rail Corporation Ltd (Line 3) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.