Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Prajapati Nagar to Chhatrapati Square metro route

Aqua Line, then Orange Line: 13 stations, about 29 min.

29 minjourney, about
13stations
1change
+ fareNagpur Metro, separate

Prajapati Nagar to Chhatrapati Square route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Aqua Line towards Lokmanya Nagar
    Board at Prajapati Nagar · trains from about 06:00 to None
    9 stops, about 16 min
    1. Prajapati Nagar
    2. Vaishnodevi Square
    3. Ambedkar Square
    4. Telephone Exchange
    5. Chitaroli Square
    6. Agrasen Square
    7. Dosar Vaisya Square
    8. Nagpur Railway Station
    9. Cotton Market
    10. Sitabuldi
    Get off at Sitabuldi
  2. Change line here, allow about 4 min.
  3. Orange Line towards Khapri
    Board at Sitabuldi · trains from about 06:14 to None
    4 stops, about 9 min
    1. Sitabuldi
    2. Congress Nagar
    3. Rahate Colony
    4. Ajni Square
    5. Chhatrapati Square

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

Chhatrapati Square to Prajapati Nagar

Questions about Prajapati Nagar to Chhatrapati Square metro

How long does the metro take from Prajapati Nagar to Chhatrapati Square?

About 29 minutes for 13 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Prajapati Nagar and Chhatrapati Square?

Yes, 1 change: at Sitabuldi take the Orange Line towards Khapri.

Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.