Swargate to Chhatrapati Sambhaji Udyan metro route
Purple Line (Line 1), then Aqua Line (Line 2): 5 stations, about 14 min.
First metro from Swargate about 06:00 · Last metro that makes every connection about 23:00
Swargate to Chhatrapati Sambhaji Udyan route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Purple Line (Line 1) towards PCMC BhavanBoard at Swargate · trains from about 06:00 to 23:00
3 stops, about 7 min
Get off at District Court - Change line here, allow about 4 min.
-
Aqua Line (Line 2) towards VanazBoard at District Court · trains from about 06:20 to 23:20
2 stops, about 4 min
Get off at Chhatrapati Sambhaji Udyan
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about Swargate to Chhatrapati Sambhaji Udyan metro
How long does the metro take from Swargate to Chhatrapati Sambhaji Udyan?
About 14 minutes for 5 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Swargate and Chhatrapati Sambhaji Udyan?
Yes, 1 change: at District Court take the Aqua Line (Line 2) towards Vanaz.
What are the first and last metro times from Swargate to Chhatrapati Sambhaji Udyan?
The first useful train leaves Swargate at about 06:00 and the last one that still makes every connection leaves at about 23:00. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Maharashtra Metro Rail Corporation Ltd (Maha Metro) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.