Monday, 16 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus
Tatanagar Jn railway station (TATA), where train 20891 starts
Photo: Anupmahato, CC BY-SA 3.0
Train No. 20891 · Vande Bharat

20891 Vande Bharat Express Running Status (TATA to BAM)

Tatanagar Jn to Brahmapur · 588 km · 11 stops · Runs Mon,Wed,Thu,Fri,Sat,Sun

Checking live position…

The full timetable is below while live data loads.

Get live updates on WhatsApp
Never miss your stopNever miss your stop
Arrival
Station
Departure
  1. Day 1
  2. Start
    Tatanagar Jn
    TATA · 0 km
    14:20
  3. 15:02
    Chaibasa
    CBSA · 62 km · 2 min halt
    15:04
  4. 16:44
    Banspani
    BSPX · 152 km · 2 min halt
    16:46
  5. 17:55
    Kendujhar
    KDJR · 208 km · 5 min halt
    18:00
  6. 18:40
    Hari Chandanpur
    HCNR · 258 km · 2 min halt
    18:42
  7. 20:05
    Jakhapura
    JKPR · 331 km · 2 min halt
    20:07
  8. 21:00
    Cuttack
    CTC · 395 km · 2 min halt
    21:02
  9. 21:15
    Bhubaneswar
    BBS · 422 km · 5 min halt
    21:20
  10. 21:35
    Khurda Road Jn
    KUR · 441 km · 10 min halt
    21:45
  11. 22:43
    Balugan
    BALU · 512 km · 2 min halt
    22:45
  12. 23:55
    Brahmapur
    BAM · 588 km
    End

Check seats on 20891

Waitlisted? The percentage is the estimated chance of confirmation. Seats can also open up from a nearby station: open the trip planner.

20891 route map

Stations plotted in order. The line joins stops directly and does not trace the exact track. Map data © OpenStreetMap contributors.

20891 coach position

C1CC
C2CC
C3CC
C4CC
C5CC
E1EC
C6CC
C7CC

Order from the engine, as last seen on 2026-11-02. Confirm on the platform coach indicator. What do the codes mean?

How late does 20891 usually run?

25 min latetypical delay, last 53 days
25%days within 15 minutes
4h 33m lateworst delay seen (2026-10-29)
23 min latemedian delay
0days over 1 hour late
0days cancelled

Based on recent days, 20891 usually reaches Brahmapur about 25 min late. When the train is running, the live card at the top shows a fresh estimate for today.

Last 7 days: typically 25 min late, against 18 min late the week before.

Tracked from 2026-09-25 to 2026-11-16. Each bar is one day, oldest on the left. Taken from our own live snapshots every 15 minutes at major stations, so a few trains on quiet routes may have gaps.

New to train travel?New to train travel?

Vande Bharat Express: common questions

What time does 20891 leave Tatanagar Jn?

20891 Vande Bharat Express is scheduled to depart Tatanagar Jn (TATA) at 14:20 and reach Brahmapur (BAM) at 23:55, a journey of about 09 h 35 min.

On which days does 20891 run?

It runs on Mon, Wed, Thu, Fri, Sat, Sun. On other days there is no run, so live status will show no train for those start dates.

How many stops does 20891 have?

11 scheduled halts over 588 km, including Chaibasa, Banspani, Kendujhar.

Which classes are available?

EC, CC. See the coach code guide for what each class means.

What is the return train?

The return service is 20892 Vande Bharat Express from Brahmapur to Tatanagar Jn.

Does 20891 Vande Bharat Express usually run late?

In the 53 days we tracked (2026-09-25 to 2026-11-16), 20891 was within 15 minutes of schedule on 25% of days. Its typical delay was 25 min (median 23 min), and the worst we saw was 4 h 33 min on 2026-10-29.

Timetable valid from 28-May-2026. Timings can change for maintenance, diversions or special notices, so check the live status on the day of travel.

From the blog