Monday, 16 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus
Brahmapur railway station (BAM), where train 20892 starts
Photo: nayansatya, CC BY-SA 3.0
Train No. 20892 · Vande Bharat

20892 Vande Bharat Express Running Status (BAM to TATA)

Brahmapur to Tatanagar Jn · 588 km · 11 stops · Runs Mon,Wed,Thu,Fri,Sat,Sun

Checking live position…

The full timetable is below while live data loads.

Get live updates on WhatsApp
Never miss your stopNever miss your stop
Arrival
Station
Departure
  1. Day 1
  2. Start
    Brahmapur
    BAM · 0 km
    05:15
  3. 05:43
    Balugan
    BALU · 76 km · 2 min halt
    05:45
  4. 06:40
    Khurda Road Jn
    KUR · 147 km · 10 min halt
    06:50
  5. 07:15
    Bhubaneswar
    BBS · 166 km · 5 min halt
    07:20
  6. 07:38
    Cuttack
    CTC · 193 km · 2 min halt
    07:40
  7. 08:23
    Jakhapura
    JKPR · 257 km · 2 min halt
    08:25
  8. 09:18
    Hari Chandanpur
    HCNR · 330 km · 2 min halt
    09:20
  9. 10:05
    Kendujhar
    KDJR · 380 km · 5 min halt
    10:10
  10. 11:23
    Banspani
    BSPX · 436 km · 2 min halt
    11:25
  11. 12:52
    Chaibasa
    CBSA · 526 km · 2 min halt
    12:54
  12. 14:50
    Tatanagar Jn
    TATA · 588 km
    End

Check seats on 20892

Waitlisted? The percentage is the estimated chance of confirmation. Seats can also open up from a nearby station: open the trip planner.

20892 route map

Stations plotted in order. The line joins stops directly and does not trace the exact track. Map data © OpenStreetMap contributors.

20892 coach position

C7CC
C6CC
C5CC
C4CC
C3CC
E1EC
C2CC
C1CC

Order from the engine, as last seen on 2026-11-01. Confirm on the platform coach indicator. What do the codes mean?

How late does 20892 usually run?

27 min latetypical delay, last 32 days
31%days within 15 minutes
1h 53m lateworst delay seen (2026-10-19)
22 min latemedian delay
3days over 1 hour late
0days cancelled

Based on recent days, 20892 usually reaches Tatanagar Jn about 27 min late. When the train is running, the live card at the top shows a fresh estimate for today.

Last 7 days: typically 19 min late, against 29 min late the week before, so it has been running better recently.

Tracked from 2026-09-27 to 2026-11-16. Each bar is one day, oldest on the left. Taken from our own live snapshots every 15 minutes at major stations, so a few trains on quiet routes may have gaps.

New to train travel?New to train travel?

Vande Bharat Express: common questions

What time does 20892 leave Brahmapur?

20892 Vande Bharat Express is scheduled to depart Brahmapur (BAM) at 05:15 and reach Tatanagar Jn (TATA) at 14:50, a journey of about 09 h 35 min.

On which days does 20892 run?

It runs on Mon, Wed, Thu, Fri, Sat, Sun. On other days there is no run, so live status will show no train for those start dates.

How many stops does 20892 have?

11 scheduled halts over 588 km, including Balugan, Khurda Road Jn, Bhubaneswar.

Which classes are available?

EC, CC. See the coach code guide for what each class means.

What is the return train?

The return service is 20891 Vande Bharat Express from Tatanagar Jn to Brahmapur.

Does 20892 Vande Bharat Express usually run late?

In the 32 days we tracked (2026-09-27 to 2026-11-16), 20892 was within 15 minutes of schedule on 31% of days. Its typical delay was 27 min (median 22 min), and the worst we saw was 1 h 53 min on 2026-10-19.

Timetable valid from 02-Jan-2026. Timings can change for maintenance, diversions or special notices, so check the live status on the day of travel.

From the blog