Noida Aqua Line extension of 8.449 km gets Cabinet nod
Union Cabinet approves 8.449 km Noida Aqua Line extension from Sector 51 to Greater Noida Sector 4 at Rs 2,390 crore. Five stations, Blue Line link, no opening date.

Photo: Dev Choubey / Pexels
The Union Cabinet has approved an 8.449 km extension of the Noida Metro Aqua Line from Noida Sector 51 to Greater Noida Sector 4, at an estimated cost of Rs 2,390 crore. Livemint reports the decision was taken on Wednesday, 11 November 2026. This is an approval for a project, not a new service, so no new station is open to passengers and your trips on the current line are unchanged.
What changed
The approval was one of several Cabinet decisions that day, chaired by Prime Minister Narendra Modi. According to Livemint, the corridor will have five elevated stations. Livemint attributes the corridor details to an official statement; the figures below are as reported by Livemint.
Livemint also says that once the extension runs, the combined active metro network in Noida and Greater Noida will reach 71.878 km.
Who it affects
The report names the places the corridor is meant to serve. For commuters, the useful part is the link between Noida and Greater Noida, which the report describes as an additional public transport option for people working or shopping in those areas.
| Area | Named in the report |
|---|---|
| Shopping | Gaur City Mall, H&S Mall, Blue Sapphire Mall, IKEA at Noida Sector 51, Anthurium Mall at Noida Sector 73 |
| Offices | Tech Mahindra and TCL Tech at Noida Sector 60, Oil Industry Development Board at Noida Sector 73, commercial space in Greater Noida Sector 4 |
Nothing in the report changes fares or timings for anyone today.
The Aqua Line now, and the Blue Line link
The extension runs from Noida Sector 51. Our own timetable data lists the current Aqua Line as 29.7 km with 21 stations, ending at Depot Station. That data gives the first train from both terminals as 06:00 (Monday to Saturday) and 08:00 on Sundays, and the last train as 22:00. Check the Noida Metro Rail Corporation (NMRC) timetable before you travel, because these times can change.
The report says the extension will have an interchange with the Delhi Metro Blue Line at Noida Sector 61. That station already exists on the Delhi Metro side, so a Blue Line transfer to the Aqua Line will only be possible once the new link is built.
| Item | What the report says |
|---|---|
| Corridor | Noida Sector 51 to Greater Noida Sector 4 |
| Length | 8.449 km |
| Stations | Five elevated (names not given in the report) |
| Cost | Rs 2,390 crore (estimated) |
| Interchange | Delhi Metro Blue Line at Noida Sector 61 |
| Opening date | Not given |
What to do
- Keep planning around the current Aqua Line. The extension is not open, and no opening date is in the report.
- Watch NMRC notices for the station names, construction plans and opening dates once they are announced.
- If you want to see how the Noida network fits into the wider system, read our Noida Metro page and our guide to metro and suburban rail differences.
Only the Cabinet approval is confirmed by this report. Station names, the construction schedule and the opening date are not in the source, so do not treat any of them as settled.
Other metro changes this month
If you follow metro expansion closely, our earlier post on the Cabinet decision covers the same approval. For Delhi, our Delhi Metro Diwali timings guide covers the festival schedule. For another city's new line, see the Bengaluru Pink Line first stretch and the Chennai Metro Poonamallee to Vadapalani opening.
Where is your train right now?
Live position, expected arrival at every stop and the delay history of the last few weeks.
Use it on your trip
Frequently asked questions
Is the Noida Aqua Line extension open to passengers?
No. The Union Cabinet approved the extension on 11 November 2026, which is an approval for a project. The report gives no construction or opening date, so the current Aqua Line trips are unchanged.
How long is the extension and how many stations will it have?
According to Livemint, the extension is 8.449 km from Noida Sector 51 to Greater Noida Sector 4, with five elevated stations. The report does not name the new stations.
Will the extension connect with the Delhi Metro?
The report says it will have an interchange with the Delhi Metro Blue Line at Noida Sector 61. That Delhi Metro station exists already, but the link will only work once the extension is built.
Should I change my travel plans because of this approval?
No. Nothing in the report changes existing services, fares or timings. Plan with the current Aqua Line timetable, and revisit only when NMRC announces a schedule.
Sources
Rules and fares change. Check the official source before you travel. Last reviewed 12 November 2026.





