Monday, 16 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus
Trains and routes

Bengaluru Pink Line's first stretch opens on 14 November

Bengaluru Pink Line's 7.5 km stretch, Kalena Agrahara to Tavarekere, opens to the public at 6 am on 14 November 2026. Interchange, frequency and what to check.

Indian Railways train and platform

Bengaluru's Pink Line first section opens to the public at 6 am on Saturday, 14 November 2026, according to Hindustan Times. The section is a 7.5 km elevated stretch from Kalena Agrahara to Tavarekere. The Prime Minister was scheduled to inaugurate it on Friday, 13 November, and the report says the opening takes the city's operational Namma Metro network to 103.6 km.

What changed

The new stretch runs through Suddaguntepalya and, according to the report, is expected to connect with the Electronic City line at Jayadeva station. Hindustan Times says the section takes Bengaluru's network past the 100 km mark, to 103.6 km, which would make it India's second largest after Delhi's.

The stretch is the first step on the Pink Line. The report says the full corridor will have a 7.5 km elevated part and a 13.7 km underground part, which will extend the route towards Nagawara. The underground part is not open and is not covered by this opening.

The date and timing here rest on the Hindustan Times report, so confirm them with the operator before you travel.

Who it affects

The source says the line is aimed at commuters travelling from Bannerghatta Road towards the Electronic City corridor. Riders who want to continue to other parts of the network are expected to change at Jayadeva. The report names HSR Layout, Jayanagar and Whitefield as places reachable from the interchange.

Our data already has the Yellow Line (the report calls it the Electronic City line), which runs from Rashtreeya Vidyalaya Road to Delta Electronics Bommasandra and includes Jayadeva Hospital and Electronic City. For the Purple and Green Line stations named in the report, see Jayanagar and Whitefield (Kadugodi).

Train details and timings

The report gives the following details for the new section. Anything not listed here is not in the source.

ItemWhat the source says
First passenger dayOpens to the public at 6 am on 14 November 2026
StretchKalena Agrahara to Tavarekere, 7.5 km elevated
InterchangeJayadeva, expected to connect with the Electronic City line
Frequency at startAbout every 8 minutes
Trains allocatedFive, with four in regular service and one on standby
FaresNot yet discussed, according to the minister quoted in the report
Network after opening103.6 km

The report says the 8-minute gap could shorten once signalling stabilises and officials check passenger demand. The minister said a decision on the interval would come in the coming days. The report gives no first or last train time for the new section, so do not plan around one until the operator publishes it.

Our Namma Metro page lists the Purple, Green and Yellow lines in our data. The Pink Line and its new stations are not in our station data yet, so use the operator for their details.

What travellers should do

  • Check the first-train timing on the day. The 6 am opening time is in the report, but the first and last trains are not. Look for the operator's notice before you plan an early start.
  • Plan for an 8-minute gap, not a fixed timetable. The minister said the interval could be reduced. Allow extra time for your first ride.
  • Allow time at Jayadeva Hospital. The interchange is new for most riders, so leave room to find the platform for the Yellow Line.
  • Do not assume a fare. The minister said fares had not been discussed. Check the announced fare before you buy a ticket.
  • Keep your usual route if you are unsure. Our data gives the Yellow Line a 7-minute peak and 10-minute off-peak frequency, so it remains a dependable option for Electronic City trips.

Bengaluru metro context

The Karnataka government has set a near-term target of more than 170 km of Metro within 18 months. Its longer-term vision is a network of 400 to 500 km, according to the report.

Our earlier explainer on the Pink Line first stretch was written before the public opening time was reported. The date and time in this post are the ones the Hindustan Times reports. For the wider Bengaluru picture, read our note on the Bengaluru-Hosur metro link proposal. For another new elevated opening, see Chennai Metro's Poonamallee-Vadapalani stretch.

If you are weighing a metro against a suburban train for a trip in the city, our explainer on metro versus suburban rail covers the main differences.

Live running status

Where is your train right now?

Live position, expected arrival at every stop and the delay history of the last few weeks.

Use it on your trip

Frequently asked questions

When does the Bengaluru Pink Line's first stretch open to the public?

According to Hindustan Times, the 7.5 km elevated section opens to the public at 6 am on 14 November 2026, after the Prime Minister's inauguration scheduled for Friday, 13 November. The date comes from the report, so check the operator before you travel.

How often will trains run on the new Pink Line stretch?

The report says services will initially run at intervals of about 8 minutes. Five trains are allocated, four in regular service and one on standby. The minister said the interval could be reduced once signalling stabilises and demand is assessed.

Where do I change trains to reach Electronic City from the new stretch?

The report says the new stretch is expected to connect with the Electronic City line at Jayadeva station. Our data shows Jayadeva Hospital and Electronic City both on the Yellow Line, so you would not need to change again between them.

Which stations are on the new Pink Line stretch?

The report names Kalena Agrahara and Tavarekere as the two ends of the 7.5 km stretch, and Jayadeva as the expected interchange. It does not give a full station list, and our metro data does not yet include the Pink Line stations, so check the operator's list when it is published.

Sources

Rules and fares change. Check the official source before you travel. Last reviewed 14 November 2026.

Keep reading