Wednesday, 4 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Ekbalpore to Rabindra Sarobar/Tollygunge Bridge bus

1 direct bus route from Ekbalpore to Rabindra Sarobar/Tollygunge Bridge in Kolkata. The quickest by number of stops is 1A, 5 stops (about 4.0 km).

Direct buses

BusBoard towardsStops
1AMukundapur
Kolkata Private Bus
5
4.0 km
Stops on route 1A from Ekbalpore to Rabindra Sarobar/Tollygunge Bridge
  1. Ekbalpore
  2. Jatin Das Park
  3. Kalighat
  4. Tollygunge P.S.
  5. Mudiali
  6. Rabindra Sarobar/Tollygunge Bridge
New to train travel?New to train travel?

Map

Map loads when you scroll here.

Trains nearby

Khiddirpur (KIRP) railway station is about 1.2 km from Ekbalpore stop.

Tollygunge (TLG) railway station is about 152 m from Rabindra Sarobar/Tollygunge Bridge stop.

Search another trip

Questions

Which bus goes from Ekbalpore to Rabindra Sarobar/Tollygunge Bridge?

1A (5 stops) run directly from Ekbalpore to Rabindra Sarobar/Tollygunge Bridge, according to OpenStreetMap route data.

Bus routes, stops and bus stands: © OpenStreetMap contributors (ODbL), which may be incomplete or out of date. Distances are straight-line. TrainLiveStatus is not affiliated with any bus operator; confirm timings with the operator before you travel.