Sector-1 to Sabarmati metro route
Yellow Line (Line 3, Phase 2 Corridor-1), then Red Line (Line 2, North-South Corridor): 14 stations, about 37 min.
First metro from Sector-1 about 06:55 · Last metro that makes every connection about 21:15
Sector-1 to Sabarmati route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Yellow Line (Line 3, Phase 2 Corridor-1) towards Koteshwar RoadBoard at Sector-1 · trains from about 06:55 to 21:15
12 stops, about 28 min
Get off at Koteshwar Road - Change line here, allow about 4 min.
-
Red Line (Line 2, North-South Corridor) towards APMCBoard at Koteshwar Road · trains from about 06:16 to 23:00
2 stops, about 5 min
Get off at Sabarmati
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Sector-1 to Sabarmati metro fare
Ahmedabad Metro (Ahmedabad-Gandhinagar): about Rs 20 for about 16.7 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about Sector-1 to Sabarmati metro
How long does the metro take from Sector-1 to Sabarmati?
About 37 minutes for 14 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Sector-1 and Sabarmati?
Yes, 1 change: at Koteshwar Road take the Red Line (Line 2, North-South Corridor) towards APMC.
What is the metro fare from Sector-1 to Sabarmati?
About Rs 20 on the Ahmedabad Metro (Ahmedabad-Gandhinagar), estimated from a distance of about 16.7 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from Sector-1 to Sabarmati?
The first useful train leaves Sector-1 at about 06:55 and the last one that still makes every connection leaves at about 21:15. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.