Brake feel and brake power tests: Railway safety drive, 12-18 Nov
The Railway Board ordered a brake feel and brake power test drive from 12 to 18 November 2026 after the Kolkata-Sairang Express derailment. What it requires.

The Railway Board has told all zonal railways to make sure running crews carry out braking tests after they take charge of a train. It has also ordered a safety drive from 12 to 18 November 2026 to check whether locomotive crews are doing the brake feel and brake power tests. The details come from a PTI report carried by Livemint, and we found no official Railway Board notice on the drive in our search.
The order follows the derailment of the Kolkata-Sairang Express near Guwahati on 11 November. A six-member probe team's preliminary findings, as reported by PTI, point to the brake pipe (BP) angle cock in the locomotive being in an isolated condition. The probe has not yet established who isolated it, or whether the crew skipped the required tests.
What changed
Two things were ordered. First, zonal railways must ensure running crews test the brakes after taking handover of a train. Second, a drive checks compliance with the brake feel and brake power tests. Any discrepancies found during the drive must be compiled and sent to the Railway Board by 20 November.
The drive runs to 18 November. The reporting deadline of 20 November falls after it.
Who it affects
The direct targets are locomotive crews, the loco pilot who runs the test and the assistant loco pilot. The assistant must watch the test, make sure the pilot carries it out and remind the pilot if needed. Passengers do not run the test.
The two tests, step by step
The Railway Board's direction sets out two tests. The speeds below are as reported by PTI.
| Test | Passenger train | Goods train |
|---|---|---|
| Brake feel test | Bring the train to 15 kmph, apply the brakes with the A-9 system by reducing brake pipe pressure. Speed should fall to about 10 kmph. | Not given in the report. |
| Brake power test | Accelerate to 60 to 70 kmph, then brake. Speed should fall to 30 to 35 kmph. | Test speeds 40 to 50 kmph, then 20 to 25 kmph. |
According to an official cited by PTI, the crew may have relied on the regenerative braking system while checking the train. The report does not confirm this.
The train involved
The Kolkata-Sairang Express, train 13125, runs from Kolkata to Sairang on Tuesdays, Wednesdays and Saturdays, according to our timetable data. It departs Kolkata at 10:45 and takes 31 hours 45 minutes. You can check its running status and timetable before you travel.
What travellers should do
- Check live running status on the train page before you leave home. Timings on the day may differ from the timetable.
- The report does not mention cancellations or changes to services, so it gives no reason to change a ticket because of this drive.
- If you see or hear a safety concern on board, tell the train staff, or call 139 (press 1 for security or medical help).
Our earlier posts on the derailment and the order are linked below. The derailment report covers the incident itself, and the crew test guide goes deeper on the procedure, and our drive notice covers the same order.
Where Kavach fits
The source does not say whether Kavach was involved in this derailment. Our Kavach explainer covers what the system does and where it is being rolled out, which is a separate question from the brake tests described here.
What we could not confirm
We did not find the Railway Board order itself, or a PIB release on the drive, in our search. The dates and the test speeds come from the PTI report. The probe's findings are preliminary and may change.
Where is your train right now?
Live position, expected arrival at every stop and the delay history of the last few weeks.
Use it on your trip
Frequently asked questions
What is the brake feel test?
According to PTI, the brake feel test has the crew bring the train to 15 kmph and apply the brakes by reducing brake pipe pressure with the main A-9 system. The speed should fall to about 10 kmph, which shows whether the brakes have taken effect.
What dates does the safety drive cover?
The report says the Railway Board ordered a safety drive from 12 to 18 November 2026 to check that crews carry out the brake feel and brake power tests. Discrepancies must be sent to the Board by 20 November.
Does this change my train ticket?
The report does not mention any cancellations, fare changes or other changes to services. It concerns how running crews test brakes after taking over a train, so check your train's running status before travelling.
Which trains does the drive cover?
The report describes the drive as checking locomotive crews across zonal railways. It does not name specific trains, so the drive should be read as a general compliance check, not a list of cancelled or affected services.
Sources
Rules and fares change. Check the official source before you travel. Last reviewed 17 November 2026.



