Tuesday, 17 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus
Trains and routes

Namma Metro Pink Line's 7.5 km stretch opens on 14 November

Namma Metro's 7.5 km elevated Pink Line stretch from Kalena Agrahara to Tavarekere opens at 6 am on 14 November 2026, with eight-minute trains at first.

Indian Railways train and platform

Namma Metro's Pink Line now has an elevated section of 7.5 km from Kalena Agrahara to Tavarekere, and it opens to the public at 6 am on 14 November 2026. Prime Minister Narendra Modi flagged off the stretch on Friday, 13 November, and took a ride with Karnataka Chief Minister DK Shivakumar, Governor Sudha Yadav, Minister Krishna Byre Gowda and MP Tejasvi Surya. Hindustan Times reports that the launch takes Bengaluru's operational network to 103.6 km.

What changed

The new stretch covers Suddaguntepalya and is expected to improve travel from Bannerghatta Road towards the Electronic City corridor. It is expected to connect with the Electronic City line at Jayadeva Hospital. From there, riders can change for the Electronic City line and continue towards HSR Layout, Jayanagar and Whitefield.

ItemDetail, as reported
New sectionElevated, 7.5 km, Kalena Agrahara to Tavarekere
Public service starts6 am, 14 November 2026
Frequency at startOne train every eight minutes
Trains allottedFive, of which four run daily and one is on standby
Expected interchangeJayadeva station, with the Electronic City line
FaresNot yet decided, according to the minister
Network after opening103.6 km

Who it affects

Commuters on the Bannerghatta Road side who want to reach the Electronic City corridor are the first group that benefits. The Namma Metro network page lists the lines already running.

Frequency may change

The eight-minute gap is a starting interval, not a settled timetable. Gowda said the interval could be reduced after the signalling stabilises and officials assess passenger demand. He said the decision would come in the days after the opening. The signalling is the first thing to get right, he said, and the frequency depends on it.

If your route will continue to the Electronic City corridor, the Electronic City station page shows that station's details. Check the operator's notices for any change in frequency.

What travellers should do

  • Keep the eight-minute gap in mind. Allow for the gap between trains, since eight minutes is the start-up figure and may change.
  • Do not assume a fare. The minister said fares had not been discussed yet. Wait for the official fare table before you budget for the new stretch.
  • Plan the interchange carefully. If you want to switch at Jayadeva to the Electronic City line, confirm the connection on the day you travel.
  • Read the earlier background. Our earlier post covers the same opening: Bengaluru Pink Line's first stretch opens on 14 November. For the proposed Hosur link, see Bengaluru Hosur metro link proposal.

The source names only the two end stations, Kalena Agrahara and Tavarekere, plus Suddaguntepalya and Jayadeva along the way. Check the official operator's notices for the full list of stations and timings on the new stretch.

Frequently asked questions

The FAQ below answers the questions travellers ask most about the opening. Each answer uses only what the source reported on the day of the opening.

Live running status

Where is your train right now?

Live position, expected arrival at every stop and the delay history of the last few weeks.

Use it on your trip

Frequently asked questions

When does the new Pink Line stretch open to the public?

According to Hindustan Times, the elevated section from Kalena Agrahara to Tavarekere opens to the public at 6 am on 14 November 2026. The Prime Minister flagged off the stretch on 13 November.

How often will trains run on the new section?

The starting interval is about eight minutes, with five trains allotted, four running and one on standby. The minister said the gap could be reduced once signalling stabilises and demand is assessed.

Can I change to the Electronic City line on this stretch?

The report says the Pink Line is expected to connect with the Electronic City line at Jayadeva station. Confirm the interchange on the day you travel, because the report describes it as an expected connection.

Are fares on the new Pink Line stretch known yet?

Not at the time of the report. The minister said fares for the new section had not yet been discussed, so check the official operator for the fare table before you travel.

Sources

Rules and fares change. Check the official source before you travel. Last reviewed 17 November 2026.

Keep reading