Tuesday, 17 November 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus
Trains and routes

Namma Metro's Pink Line stretch takes the network to 103.6 km

Bengaluru's 7.5 km elevated Pink Line stretch, Kalena Agrahara to Tavarekere, opens 6 am on 14 November per Hindustan Times. Frequency, interchange, fares.

Indian Railways train and platform

Prime Minister Narendra Modi flagged off the elevated stretch of Namma Metro's Pink Line on Friday, 13 November 2026, according to Hindustan Times. He rode a train with Karnataka Chief Minister DK Shivakumar, Governor Sudha Yadav and others, according to the report. The 7.5 km section runs from Kalena Agrahara to Tavarekere, and the report says it opens to passengers at 6 am on 14 November.

The report says the opening takes Bengaluru's operational Metro network to 103.6 km, which it calls India's second-largest after Delhi.

What changed

The new section passes through Suddaguntepalya and is expected to improve connectivity for commuters travelling from Bannerghatta Road towards the Electronic City corridor. The report expects it to connect with the Electronic City line at Jayadeva station, which our metro data lists as Jayadeva Hospital. From there, riders are expected to be able to continue toward HSR Layout, Jayanagar and Whitefield.

The stations on the stretch, according to our metro data, are Kalena Agrahara, Hulimavu, IIM Bangalore, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere. Check the operator's board for the stop you need before you travel.

Frequency and trains

Trains will run at intervals of eight minutes at first. Five trains are allocated to the line: four in regular service and one on standby. Minister for Greater Bengaluru Development Krishna Byre Gowda said the interval could be reduced once signalling stabilises and officials assess passenger demand.

ItemWhat the report says
Opening6 am on 14 November 2026
FrequencyAbout 8 minutes at first
Trains5 allocated: 4 running, 1 standby
FaresNot discussed at the time of the report

Who it affects

The report says the line is expected to help commuters travelling from Bannerghatta Road towards the Electronic City corridor and other parts of the Metro network. Riders heading to HSR Layout or Whitefield are expected to switch at Jayadeva. The report does not name a mainline station on this stretch.

What to do before you ride

  • Check the Namma Metro network page in our data at /metro/bangalore, and the Yellow Line if your trip uses the Electronic City connection.
  • Look up the Jayadeva Hospital station page before changing lines.
  • Expect an eight-minute gap between trains at first.
  • Confirm the fare on the operator's fare chart. The report gave no figure.

Our metro data does not yet have a Pink Line page for Bengaluru, so the links above point to the network, the Yellow Line and the interchange station. Mainline trains from Bengaluru are on the trip planner.

Our earlier coverage of the line is in the 14 November opening guide, the stretch and station guide and the first-stretch opening note.

What we could not confirm

We did not find an official BMRCL or PIB notice for the 14 November opening date in our search. The date and the 103.6 km figure rest on the Hindustan Times report. Confirm the start with the operator before you rely on it for a fixed plan.

Live running status

Where is your train right now?

Live position, expected arrival at every stop and the delay history of the last few weeks.

Use it on your trip

Frequently asked questions

When does the Pink Line stretch open to passengers?

According to Hindustan Times, the 7.5 km elevated stretch from Kalena Agrahara to Tavarekere opens at 6 am on 14 November 2026, a day after the Prime Minister flagged it off. We did not find an official notice confirming the date, so check the operator if you travel on the first day.

How often will trains run on the new stretch?

The report says trains start at about eight-minute intervals, with five trains allocated: four in regular service and one on standby. The minister said the interval could be cut once signalling stabilises and demand is assessed.

Where can I change to the Electronic City line?

The report expects the interchange at Jayadeva station, which our metro data lists as Jayadeva Hospital. It is described as an expected connection, so confirm the interchange on the day you travel.

Does the Pink Line connect with mainline stations?

The Hindustan Times report does not name a mainline railway station on this stretch, so we have not listed one. For mainline trains from Bengaluru, use the trip planner.

Sources

Rules and fares change. Check the official source before you travel. Last reviewed 17 November 2026.

Keep reading