PDPU to Sector-16 metro route
Violet Line (Line 4, Phase 2 Corridor-2), then Yellow Line (Line 3, Phase 2 Corridor-1): 11 stations, about 29 min.
First metro from PDPU about 07:52 · Last metro that makes every connection about 19:17
PDPU to Sector-16 route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Violet Line (Line 4, Phase 2 Corridor-2) towards GNLUBoard at PDPU · trains from about 07:52 to 19:171 stop, about 2 minGet off at GNLU
- Change line here, allow about 4 min.
-
Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma MandirBoard at GNLU · trains from about 07:11 to 21:36
10 stops, about 23 min
Get off at Sector-16
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
PDPU to Sector-16 metro fare
Ahmedabad Metro (Ahmedabad-Gandhinagar): about Rs 20 for about 13.3 km, from the published fare chart.
Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.
Search another route
Questions about PDPU to Sector-16 metro
How long does the metro take from PDPU to Sector-16?
About 29 minutes for 11 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between PDPU and Sector-16?
Yes, 1 change: at GNLU take the Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma Mandir.
What is the metro fare from PDPU to Sector-16?
About Rs 20 on the Ahmedabad Metro (Ahmedabad-Gandhinagar), estimated from a distance of about 13.3 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.
What are the first and last metro times from PDPU to Sector-16?
The first useful train leaves PDPU at about 07:52 and the last one that still makes every connection leaves at about 19:17. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.