Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Sector-1 to Koba Gam metro route

Direct on the Yellow Line (Line 3, Phase 2 Corridor-1): 6 stations, about 14 min.

14 minjourney, about
6stations
Directno change
Rs 10fare, estimated

First metro from Sector-1 about 06:55 · Last metro that makes every connection about 21:15

Sector-1 to Koba Gam route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Board at Sector-1 · trains from about 06:55 to 21:15
    6 stops, about 14 min
    1. Sector-1
    2. Infocity
    3. Dholakuva Circle
    4. Randesan
    5. Raysan
    6. GNLU
    7. Koba Gam
    Get off at Koba Gam

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Sector-1 to Koba Gam metro fare

Ahmedabad Metro (Ahmedabad-Gandhinagar): about Rs 10 for about 7.2 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Koba Gam to Sector-1

Questions about Sector-1 to Koba Gam metro

How long does the metro take from Sector-1 to Koba Gam?

About 14 minutes for 6 stations. Add your waiting time at the platform.

Is there a direct metro from Sector-1 to Koba Gam?

Yes. Take the Yellow Line (Line 3, Phase 2 Corridor-1) towards Koteshwar Road; Koba Gam is the 6th stop.

What is the metro fare from Sector-1 to Koba Gam?

About Rs 10 on the Ahmedabad Metro (Ahmedabad-Gandhinagar), estimated from a distance of about 7.2 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Sector-1 to Koba Gam?

The first useful train leaves Sector-1 at about 06:55 and the last one that still makes every connection leaves at about 21:15. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.