Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Vastral to Sachivalaya metro route

Blue Line (Line 1, East-West Corridor), then Red Line (Line 2, North-South Corridor), then Yellow Line (Line 3, Phase 2 Corridor-1): 30 stations, about 1 h 26 min.

1 h 26 minjourney, about
30stations
2changes
+ fareAhmedabad Metro (Ahmedabad-Gandhinagar), separate

First metro from Vastral about 06:25 · Last metro that makes every connection about 20:27

Vastral to Sachivalaya route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Board at Vastral · trains from about 06:25 to 23:05
    8 stops, about 24 min
    1. Vastral
    2. Rabari Colony
    3. Amraiwadi
    4. Apparel Park
    5. Kankaria East
    6. Kalupur Railway Station
    7. Gheekanta
    8. Shahpur Station
    9. Old High Court
    Get off at Old High Court
  2. Change line here, allow about 4 min.
  3. Board at Old High Court · trains from about 06:34 to 23:24
    8 stops, about 21 min
    1. Old High Court
    2. Usmanpura
    3. Vijay Nagar
    4. Vadaj
    5. Ranip
    6. AEC
    7. Sabarmati
    8. Motera Stadium
    9. Koteshwar Road
    Get off at Koteshwar Road
  4. Change line here, allow about 4 min.
  5. Board at Koteshwar Road · trains from about 06:55 to 21:20
    14 stops, about 32 min
    1. Koteshwar Road
    2. Vishwakarma College
    3. Tapovan Circle
    4. Narmada Canal
    5. Koba Circle
    6. Juna Koba
    7. Koba Gam
    8. GNLU
    9. Raysan
    10. Randesan
    11. Dholakuva Circle
    12. Infocity
    13. Sector-1
    14. Sector-10A
    15. Sachivalaya
    Get off at Sachivalaya

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Search another route

Sachivalaya to Vastral

Questions about Vastral to Sachivalaya metro

How long does the metro take from Vastral to Sachivalaya?

About 86 minutes for 30 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Vastral and Sachivalaya?

Yes, 2 changes: at Old High Court take the Red Line (Line 2, North-South Corridor) towards Koteshwar Road; at Koteshwar Road take the Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma Mandir.

What are the first and last metro times from Vastral to Sachivalaya?

The first useful train leaves Vastral at about 06:25 and the last one that still makes every connection leaves at about 20:27. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.