Vijay Nagar to Sector-1 metro route
Red Line (Line 2, North-South Corridor), then Yellow Line (Line 3, Phase 2 Corridor-1): 18 stations, about 49 min.
First metro from Vijay Nagar about 06:39 · Last metro that makes every connection about 21:00
Vijay Nagar to Sector-1 route map
Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.
Step by step
-
Red Line (Line 2, North-South Corridor) towards Koteshwar RoadBoard at Vijay Nagar · trains from about 06:39 to 23:29
6 stops, about 16 min
Get off at Koteshwar Road - Change line here, allow about 4 min.
-
Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma MandirBoard at Koteshwar Road · trains from about 06:55 to 21:20
12 stops, about 28 min
Get off at Sector-1
Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.
Search another route
Questions about Vijay Nagar to Sector-1 metro
How long does the metro take from Vijay Nagar to Sector-1?
About 49 minutes for 18 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.
Do I need to change trains between Vijay Nagar and Sector-1?
Yes, 1 change: at Koteshwar Road take the Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma Mandir.
What are the first and last metro times from Vijay Nagar to Sector-1?
The first useful train leaves Vijay Nagar at about 06:39 and the last one that still makes every connection leaves at about 21:00. These are estimates from the line timings, so check the last train at the station.
Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.