Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Raysan to Vijay Nagar metro route

Yellow Line (Line 3, Phase 2 Corridor-1), then Red Line (Line 2, North-South Corridor): 14 stations, about 39 min.

39 minjourney, about
14stations
1change
Rs 25fare, estimated

First metro from Raysan about 07:04 · Last metro that makes every connection about 21:24

Raysan to Vijay Nagar route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Board at Raysan · trains from about 07:04 to 21:24
    8 stops, about 19 min
    1. Raysan
    2. GNLU
    3. Koba Gam
    4. Juna Koba
    5. Koba Circle
    6. Narmada Canal
    7. Tapovan Circle
    8. Vishwakarma College
    9. Koteshwar Road
    Get off at Koteshwar Road
  2. Change line here, allow about 4 min.
  3. Board at Koteshwar Road · trains from about 06:16 to 23:00
    6 stops, about 16 min
    1. Koteshwar Road
    2. Motera Stadium
    3. Sabarmati
    4. AEC
    5. Ranip
    6. Vadaj
    7. Vijay Nagar
    Get off at Vijay Nagar

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Raysan to Vijay Nagar metro fare

Ahmedabad Metro (Ahmedabad-Gandhinagar): about Rs 25 for about 17.7 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Vijay Nagar to Raysan

Questions about Raysan to Vijay Nagar metro

How long does the metro take from Raysan to Vijay Nagar?

About 39 minutes for 14 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Raysan and Vijay Nagar?

Yes, 1 change: at Koteshwar Road take the Red Line (Line 2, North-South Corridor) towards APMC.

What is the metro fare from Raysan to Vijay Nagar?

About Rs 25 on the Ahmedabad Metro (Ahmedabad-Gandhinagar), estimated from a distance of about 17.7 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Raysan to Vijay Nagar?

The first useful train leaves Raysan at about 07:04 and the last one that still makes every connection leaves at about 21:24. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.