Saturday, 3 October 2026 Live data, refreshed every few minutes Railway newsहिन्दी
TrainLiveStatus

Vijay Nagar to Raysan metro route

Red Line (Line 2, North-South Corridor), then Yellow Line (Line 3, Phase 2 Corridor-1): 14 stations, about 39 min.

39 minjourney, about
14stations
1change
Rs 25fare, estimated

First metro from Vijay Nagar about 06:39 · Last metro that makes every connection about 21:00

Vijay Nagar to Raysan route map

Loading map…

Coloured lines show each metro line you ride; the dashed line is a walk. Tap a dot for the station.

Step by step

  1. Board at Vijay Nagar · trains from about 06:39 to 23:29
    6 stops, about 16 min
    1. Vijay Nagar
    2. Vadaj
    3. Ranip
    4. AEC
    5. Sabarmati
    6. Motera Stadium
    7. Koteshwar Road
    Get off at Koteshwar Road
  2. Change line here, allow about 4 min.
  3. Board at Koteshwar Road · trains from about 06:55 to 21:20
    8 stops, about 19 min
    1. Koteshwar Road
    2. Vishwakarma College
    3. Tapovan Circle
    4. Narmada Canal
    5. Koba Circle
    6. Juna Koba
    7. Koba Gam
    8. GNLU
    9. Raysan
    Get off at Raysan

Journey times are estimates from the distance between stations and each line's running speed, plus time to change lines. They do not include waiting for the first train.

New to train travel?New to train travel?

Vijay Nagar to Raysan metro fare

Ahmedabad Metro (Ahmedabad-Gandhinagar): about Rs 25 for about 17.7 km, from the published fare chart.

Fares are worked out from our distance estimate, so a journey near a slab boundary may cost one slab more or less. Smart card, QR and holiday discounts are not included. Check the exact fare on the official site.

Search another route

Raysan to Vijay Nagar

Questions about Vijay Nagar to Raysan metro

How long does the metro take from Vijay Nagar to Raysan?

About 39 minutes for 14 stations, including about 4 minutes for each change of line. Add your waiting time at the platform.

Do I need to change trains between Vijay Nagar and Raysan?

Yes, 1 change: at Koteshwar Road take the Yellow Line (Line 3, Phase 2 Corridor-1) towards Mahatma Mandir.

What is the metro fare from Vijay Nagar to Raysan?

About Rs 25 on the Ahmedabad Metro (Ahmedabad-Gandhinagar), estimated from a distance of about 17.7 km and the published fare slabs. Card and QR ticket discounts, and Sunday or holiday fares, can lower this.

What are the first and last metro times from Vijay Nagar to Raysan?

The first useful train leaves Vijay Nagar at about 06:39 and the last one that still makes every connection leaves at about 21:00. These are estimates from the line timings, so check the last train at the station.

Timings and fares: Gujarat Metro Rail Corporation Ltd (GMRC) (official site), checked 2026-10-03. Times at intermediate stations are estimates. Station locations: OpenStreetMap contributors. Not affiliated with any metro operator.